Overly staisfied with their first installation, Serres Lefort entrusted CF Boiler, in 2016, with the responsibility of supplying a second heat generation equipment in their new greenhouse project. A nice vote of confidence!
CF Boiler is proud to contribute to this new 10 hectare project, which is a reference in the field of greenhouse cultivation by producing 100% organic vegetables with a 100% natural fuel. The end results were two boilers of 8 MW hot water with an efficiency greater than 90%, representing significant fuel savings for the customer.
The commissioning, completed in late 2016, was a success despite a very tight schedule. These 2 boilers use forest chips and occasionally clean construction residues as fuel. Once again, the reliability and autonomy of the equipment in place ensures the supply of heat, while generating significant savings for the customer. A business opportunity won, thanks to proven equipment performance purchased previously in 2011.